The VI Risk Pathway Regulatory Updates, Hot Topics, New Technologies
Status of Short-Term Exposures to TCE
Regulatory Default Soil Gas Attenuation Factors
VI Indicators and Surrogates
Return of the J&E Model
Passive Vapor Mitigation Part 1 - Evaluation & Design
Various passive mitigation approaches for new construction applications
How the building type may influence the design and mitigation approach used
Three new sub-slab vapor barrier systems and appropriate applications for those technologies
Passive Vapor Mitigation Part 2 - Installation, QA QC & Case Studies
How sub-slab venting and barrier technologies are installed
The importance of QA/QC procedures in the field for new construction
Installation process for a vapor mitigation coating system designed for existing building mitigation
Case Study: Using an Innovative Vapor Barrier Technology
Use of a reliable, cost-effective vapor mitigation solution allowed client to meet milestones and stay on time and on budget
Sites required a vapor barrier that was resistant, with documented diffusion coefficients, to low level TCE and methane that could be approved by Michigan’s Department of Environment, Great Lakes & Energy (EGLE)
Are you planning a vapor intrusion barrier project?
Contact us for a free estimate.