Project snapshot highlights:

  • Preemptive vapor intrusion mitigation integrated beneath the slab to protect indoor air quality long term
  • EverShield® vapor barrier system installed across the full building footprint during construction
  • Passive, durable solution designed for high-traffic retail use without impacting project schedule